§ 13. Record drawings.  


Latest version.
  • Prior to acceptance of the subdivision, the engineer for the developer shall submit to the city a complete set of record drawings of the drainage, water and sanitary sewer improvements showing all changes made in the plans during construction and containing on each sheet a "record drawing" stamp bearing the signature of the engineer and the date. In addition, one reproducible set of paper plan sheets, one mylar set, and a compact disc containing an electronic version of the files in TIFF format shall be submitted.

(Ord. No. 99-1132, § 2, 8-2-1999; Ord. No. 07-1725, § 1, 7-2-2007)